A cozy little CVG cedar second floor sauna for two with a fir floor and a good view.

Design and development

General Notes


Window specs

The sizes I suggest are flexible, but I think we should make them the same size. Height approx 24” and width approx 32”.

Hopper style for the heat chamber and fixed for the vestibule, but you could make that a casement, awning, or hopper if you wish. Remember, hopper windows open inward by tilting in at the top. Awning windows open outward by tilting out at the bottom. The choice is yours on window operation. Opening top will let steam out better. Don't forget to make them tempered glass and if you want to go the extra mile get triple glazed. And definitely wood frame.

Final deets: no brickmold or exterior flange and no jamb on the inside.

Etc.

I haven't had a chance to review the specs on the Kip stove yet, so I have not factored in any special considerations such as heat baffle or exhausting for that yet, nor the installation of said unit. Below is the estimate so far of my hours and materials. I ultimately bill on a time and materials basis and do not mark materials up. I keep detailed notes and photos of the process and will update this site every few days. I'll put the drawings and spec sheets in the Project Assets section at some point soon.

Estimate


Materials

Insulation 120 # Vapor barrier 415 # Woodfiber insulation Wood 120 # Pine subfloor 640 # Fir flooring note: I need to pull the old subfloor, insulate, install gapped pine subfloor, and install CVG Fir flooring. Fasteners 85 # Tape, nails, screws Sum $1,380.00

Labor

8 * 85 # Design and logistics 8 * 85 # Demo and layout 6 * 85 # Framing 12 * 85 # Window install and exterior siding tie-in 12 * 85 # Insulation 6 * 85 # Flooring 40 * 85 # Paneling 16 * 85 # Custom doors note: we should have enough extra CVG and insulation fiberboard that I can make a couple of insulated doors to replace the not CVG ones. Sum $9,180

Grand Total $10,560

Invoices


Invoice # 1

10-17-26 Deposit invoice of 50% estimated total.

$5,000 due at your earliest convenience, please and thanks! Feel free to drop a check strait into my mailbox if it's easiest.